发表于:2007-08-24 20:35:00
楼主
Construction and Installation
安装施工
( A )
The initial stage of site formation provides a total are of 46 hectares.
首期地盘平整工程可提供46公顷土地
It involves the excavation of over 2.2million cubic metres of material to form reclamation behind a 1.3km long seawall.
需要挖掘超过220立方米土石方,以建成长达1.3km的防洪堤
The civil design is carried out by Centeral-Southern China Power Design Institute.
土木工程设计由中南电力设计院负责
Who is responsible for the plant erection?
谁负责电厂的安装呢
Electric Power Construction Company is responsible for the plant erection. The company is quite experienced in erection works.
电力建设公司负责电厂的安装,该公司在安装工程方面非常有经验
Through limited bidding, Hubei Electric Power Co. awarded the contracts for site formation,
piling, main civil works, chimney works and cooling water works to local contractors.
通过议标,湖北省电力局把地盘平整工程能够打桩、主要土建工程、烟囱和冷却水工程的合同授予了当地承包商
How about your quality assurance systems?
你们的质量保证体系是怎样的
The quality assurance systems we use have carried approvals to ISO 9001.
我们使用的质量保证体系通过了ISO9001标准认可
Let me propose a toast to your successful commissioning. Many congratulations on your achievement
请允许我提以为你们成功的调试而干杯,祝贺你们的成就
Are you confident (that) things’re taking a good turn for construction safety?
你相信施工安全情况正在好转吗
construction schedule 施工进度
erection quality 安装质量
equipment delivery 设备交货
I have much confidence in their improvement efforts under HEPC’s over all management and control of the construction at site.
在湖北省电力公司对施工现场的总体管理和控制下,我对它们的改进措施充满信心
How do you think of the project progress?
你对工程的进展有何看法
I am very optimistic about the project situation. Based on many years of experience in power station construction, management and electricity supply, I belive that Hubei Electric Power Company can ensure technical excellence, sound budget control, efficient and safe operation.
我对工程情况非常乐观。我相信,具有多年的电厂建设、管理和供电经验的湖北电力公司可以确保电厂技术先进、财政管理完善、效率高及运行安全
Are you sure you have the abilities to be the manager of this construction project?
您认为俄日您有能力成为施工项目经理吗
I think my training and experience have put me in with a chance.
我想我受过的训练及工作经验使我可以胜任该项工作
We have to speed up subsoil umprovement before rain season approaches.
在雨季到来之前,我们要加快地基处理
pile foundation construction 桩基施工
earth and rock work 土石方施工
concrete work 混凝土施工
thermal insulation work 保温施工
The constructor has to start the boiler steel structure erection in this month so as to catch up with the construction schedule.
为赶工期,承包商必须在这个月开始锅炉钢结构安装
turbine-generator pedestal construction 汽轮发电机基座施工
main power building structure construction 主厂房结构施工
chimney construction 烟囱施工
water intake structure construction 取水建筑物施工
renforced concrete circulating water pipe construction
钢筋混凝土循环水管施工
coal handling structure construction 输煤结构施工
ash yard dam construction 灰坝施工
boiler erection 锅炉安装
fan installation 风机安装
steam turbine governing system installation 汽轮机调节系统安装
overhead crane erection 桥式起重机安装
tower crane 塔式起重机
gantry crane 龙门起重机
bus-bar installation 母线安装
installation of auxiliary power switchgear 厂用配电装置安装
installation of secondary and control wiring 二次线安装
installation of thermal instrument and control system热工控制系统安装
I feel completely washed out after finishing the startup and commissioning test, and I need some sleep.
刚做完启动调整试验,现在我感到十分疲乏,我需要睡一会儿
energizing of auxiliary power system 厂用电受电
commissioning of water treatment system 化学水处理调试
boiler initial firing-up 锅炉首次点火
scavenging of steam system 蒸汽系统吹洗
initial startup of steam turbine 汽轮机首次通汽启动
testing of unit interlock protection 机组连锁试验
electric system startup test 电气系统整套启动实验
commissioning test of automatic